Please note that a Good Cause extension request will also need to be filed via the Extension Request Form in the SMART portal for the Solar Tariff Generation Unit (STGU) in question. Filing the Good Cause extension request in the SMART portal will place the STGU back in Extension Review status while the Good Cause request is pending with the Department.

Please confirm whether the STGU has received the fee-based extension pursuant to Section 6(a) of the Statement of Qualification Reservation Period Guideline.(Required)

If yes, please upload documentation below demonstrating the fee-based extension has been received by the STGU (e.g. copy of the confirmation email from the PowerClerk application portal sent by the Solar Program Adminstrator, CLEAResult). If no, the STGU is not yet eligible for a good cause extension per Section 6(e) of the Statement of Qualification Reservation Period Guideline.

The STGU is not eligible and you can not submit this form.

I. Contact Information

Provide the following contact information for the person submitting the form:
Name(Required)
Address(Required)
Backup Contact
Additional Backup Contact
Statement of Qualification Application (SQA) Affiliation(Required)
If other, please describe corporate relationship to the STGU. Supporting documentation may be uploaded below as “additional documentation” under Section 3, Question 7 below.

II. Solar Tariff Generation Unit (STGU) Information

Provide the following site and identification information for the STGU seeking an extension:
How many STGUs does the request pertain to?

1st STGU

ID numbers begin with SMANG_, SMAES_, or SMAUN_
Project types may include Building Mounted, Canopy, Brownfield, Community Shared Solar, Public Entity, Low Income Property, etc.
1 - STGU Site Address(Required)
1 - Distribution Company Service Territory(Required)

2nd STGU

ID numbers begin with SMANG_, SMAES_, or SMAUN_
Project types may include Building Mounted, Canopy, Brownfield, Community Shared Solar, Public Entity, Low Income Property, etc.
2 - STGU Site Address(Required)
2 - Distribution Company Service Territory(Required)

3rd STGU

ID numbers begin with SMANG_, SMAES_, or SMAUN_
Project types may include Building Mounted, Canopy, Brownfield, Community Shared Solar, Public Entity, Low Income Property, etc.
3 - STGU Site Address(Required)
3 - Distribution Company Service Territory(Required)
Drop files here or
Max. file size: 50 MB.

    III. Request for an Extended Reservation Period for Good Cause

    1. Other than the fee-based extension, what additional extensions has the STGU received under Section 6 of the Guideline, if any? If applicable, when did the STGU receive the extension(s)?(Required)
    Date Received - Extension for Legal Challenges
    Date Received - Extension Pending ASO Study
    Date Received - Extension for Good Cause
    Date Received - Extension for COVID-19
    2. What is the current expiration date of the STGU's preliminary Statement of Qualification?(Required)
    Please provide a bulleted list of the main points of justification for the request.

    See Section 6(e) of the Reservation Period Guideline (opens in new tab) for additional guidance on the criteria that qualify for an extension.

    5. Requested documentation may include, but is not limited to, the following (PDF or Excel format)

    e.g. copy of the confirmation email from the PowerClerk application portal sent by the Solar Program Administrator, CLEAResult
    Drop files here or
    Max. file size: 50 MB.
      Drop files here or
      Max. file size: 50 MB.
        Drop files here or
        Max. file size: 50 MB.
          Applicants should provide a detailed timeline which aligns with the documentation of the delays. The timeline should include the anticipated dates for mechanical completion and authorization to interconnect.
          Drop files here or
          Max. file size: 50 MB.
            Drop files here or
            Max. file size: 50 MB.
              Drop files here or
              Max. file size: 50 MB.
                Drop files here or
                Max. file size: 50 MB.

                  IV. Affirmation and Signature

                  Affirmation(Required)

                  You may temporarily save this form for 30 days. To save the form, click on the “save and resume later” link below. DOER recommends that you email the link to yourself to retrieve the partially completed form at a later date. Check your spam folder if you requested an email but did not receive one. Be aware that every time you click on the “save and resume later” button, you will receive a NEW temporary link. Be sure to use the latest link to ensure the latest changes are saved.